de
en
Schliessen
Detailsuche
Bibliotheken
Projekt
Impressum
Datenschutz
Schliessen
Publizieren
Besondere Sammlungen
Digitalisierungsservice
Hilfe
Impressum
Datenschutz
zum Inhalt
Detailsuche
Schnellsuche:
OK
Ergebnisliste
Titel
Titel
Inhalt
Inhalt
Seite
Seite
Im Werk suchen
Service level agreement aware resource management / von Matthias Hovestadt. 2006
Inhalt
Introduction
Scope of this Work
Document Structure
Foundations
Resource Management
Grid Computing
First Generation
Second Generation
Third Generation
Commercial Grids
Service Level Agreements
Basics
Content of an Agreement
Initiation of Negotiation
WS-Agreement and WS-AgreementNegotiation Protocol
Structure of a Service Level Agreement
Context
Terms
Guarantee Terms
Negotiation of Service Level Agreements
SLA-aware Scheduling
Negotiation Requirements of Broker Services
Levels of Service Quality
SDTs on Resource Specific QoS
SDTs on Guarantee Level
SDTs on System Policies
Phases of Operation
Negotiation
Pre-Runtime Phase
Runtime Phase
Post-Runtime Phase
Timing Aspects of Runtime Phases
Overhead caused by Initialization
Overhead caused by Checkpointing
Overhead caused by Migration
Overhead caused by Restart
Determining the Minimum Slot
Determining the Checkpoint Frequency
Fault Tolerance with intra-cluster scope
Basic SLA-aware Scheduling
Input Parameters
Output Parameters
Initialization
Handling of Running and SLA-Reservation Jobs
Handling of Problematic Jobs
Handling of SLA-Requests on Reservations
Handling of SLA-Non-Reservation Jobs
Handling of regular SLA-Requests
Handling of existing and requested Best-Effort Jobs
SLA-aware Scheduling with Job Suspension
Suspension of Best-Effort Jobs
Suspension of SLA-bound Jobs
Partial Execution
Increasing Level of Fault Tolerance
Increasing Utilization
Buffer Nodes
Fault Tolerance with cross-border scope
Identification of Migration Candidates
Application of Customer Defined Policies
Generation of Compatibility Profiles
Static Profile Matching
Filtering of Static Results
Negotiation and Migration
Migration of Problematic Jobs
Migration of General Jobs
Design Aspects
The HPC4U Project
Resource Management System
Grid Interface (GI) with Negotiation Manager (NM)
Planning Manager (PM) and Machine Manager (MM)
Access Manager (AM)
Migration Controller (MC)
Configuration Manager (CM)
Execution Manager (EM)
Subsystem Controller (SSC)
Checkpoint Generation
Compatibility Profile
Architecture and System Properties
Operating System
Checkpoint System
Processor Architecture
Other System Properties
Libraries
Results and Perspectives
Fault Tolerance Provision
Use-Case Experiences
Swedish Meteorological and Hydrological Institute
Fault Tolerance Aspects
Centre of Excellence in Aeronautical Research
Fault Tolerance Aspects
Key Requirement Security
Related Work
Service Level Agreements in Grid Middleware
Advance Reservations and GARA
Service Negotiation and Allocation Protocol
Grid Broker Services
GRUBER/DI-GRUBER SLA broker
White Rose Grid
NextGRID
SLBSH Project
Grid Economy
Process Checkpointing
Berkeley Labs Checkpointing and Restart (BLCR)
IBM Metacluster
Conclusion
Bibliography
Die detaillierte Suchanfrage erfordert aktiviertes Javascript.